How Long Does It Take to Develop an iOS App in 2025
Let’s Build Something Amazing Together
1. Planning & Discovery (1–4 weeks)
✅ Define Goals and Target Audience
First, you begin with clarity. You establish who your app serves and what value it offers. A clear vision helps developers avoid scope creep later.
✅ Market Research
Then, you investigate competitors and trends. Doing so reveals features users expect today in 2025.
✅ Feature Prioritization
Next, you rank features by importance. You categorize features as “must-have,” “nice-to-have,” or “future”. This paid-off effort ensures your early-release version (MVP) succeeds.
✅ Technical Feasibility
Also, you discuss architecture with your app development company or in-house team. They evaluate platform choices (SwiftUI vs UIKit), backend needs, and third-party integrations.
Overall, planning typically takes 1–4 weeks, depending on your clarity and the complexity of your idea.
2. UX/UI Design (2–6 weeks)
✅ Wireframes
Firstly, you sketch basic screens. Wireframes define layout and user flow while saving time and effort on design.
✅ Design System & High-Fi Mockups
Then, your UX designers create a design system that includes fonts, colors, icons, and components. After that, they draft high-fidelity mockups to show exactly how the app looks.
✅ Prototyping & Feedback
Subsequently, interactive prototypes show clickable or tappable screens. You test user interactions early to spot usability issues.
In total, expect 2–6 weeks, depending on the number of screens and how fast the feedback loop is.
3. iOS App Development (8–20 weeks)
This phase likely takes the longest because it involves actual coding.
3.1 Setting Up the Environment (1–2 weeks)
- Configure Xcode, Git, performance tools, build pipelines, and initial project skeleton.
- Collaborate with your mobile app development company to align on coding standards.
3.2 Front-End (UI Components + Navigation) (4–10 weeks)
- Developers code screens, layout constraints, UI transitions, animations, and input forms.
- They ensure support for iOS 16/17 and adaptive UI for multiple iPhones and iPads.
3.3 Back-End Integration (4–8 weeks)
If your app needs login, databases, or API calls:
- Developers build or integrate server-side features (using REST, GraphQL, Firebase, etc.).
- They implement user authentication, data models, offline storage, and sync logic.
3.4 Module-by-Module Implementation
A typical development schedule might look like:
- Core flow (e.g., login, onboarding): 2–4 weeks
- Primary features (feed, search, content): 3–6 weeks
- Social features (chat, sharing, notifications): 3–5 weeks
- Settings, user profile, payments: 2–4 weeks
3.5 Internal Alpha Build & Iteration
After initial coding, your developer builds an alpha version. You test it internally, record bugs, and update features promptly.
Thus, pure development stretches from 8 to 20 weeks, varying by complexity, number of features, and development team maturity.
4. Testing & Quality Assurance (2–6 weeks, parallel)
✅ Unit & UI Automated Tests
Automated tests validate individual functions (unit tests) and user flows (UI tests with XCTest or XCUITest).
✅ Manual QA
Testers manually execute test cases to capture visual or logical issues. They test on multiple devices, iOS versions, and networks.
✅ Beta Testing (TestFlight)
You release a TestFlight build to internal testers or small external groups. Their feedback catches real-world issues.
You repeat the testing cycle a few times until the app is stable and free of critical bugs. Generally, this takes 2–6 weeks, which runs in parallel with development to save time.
5. App Store Submission & Review (2–4 weeks)
✅ App Preparation
You prepare metadata (title, description, keywords), privacy policy, app icon, screenshots, and localization.
✅ Build Submission
You upload your release build via Xcode or Transporter tool.
✅ App Review Process
Apple reviews your app, which can take anywhere from 2 days to 2 weeks depending on the complexity and whether your app uses specific privacy features (like HealthKit, Core NFC, or background location). If Apple requests clarifications or changes, you’ll need time to respond.
All in all, the store submission process typically takes around 2–4 weeks.
6. Post-Launch & Maintenance (Ongoing)
- Bug fixes & updates in response to user feedback.
- New features – You may improve or iterate on your MVP.
- OS updates support — Upgrade the app for new iOS versions.
- Analytics & monitoring — Track key metrics like DAU, retention, crashes.
Ready to Bring Your iOS App to Life?
Total Timeline Overview
Below is a summary breakdown:
Stage | Duration |
---|---|
Planning & Discovery | 1–4 weeks |
UX/UI Design | 2–6 weeks |
iOS App Development | 8–20 weeks |
Testing & QA | 2–6 weeks |
App Store Submission & Review | 2–4 weeks |
Total (to Launch) | 15–40 weeks (≈4–10 months) |
Post-Launch Nuances (ongoing) | 3–6+ months |
In short, a typical iOS app in 2025 takes 4–10 months to reach its first launch. However, this duration can shorten if you limit scope or engage a professional app development company with proven processes.
What Influences Development Time?
Multiple factors shape how long development takes:
Complexity of Features
- Simple apps (e.g., calculator, informational): 3–5 months
- Medium complexity (user accounts, database, moderate logic): 6–9 months
- Advanced apps (real-time chat, AR/VR, heavy backend): 9–12+ months
Number of Supported Devices & OS Versions
Optimizing for various devices (iPhones, iPads, future Apple Vision) and iOS versions adds weeks.
Team Size & Experience
A seasoned the best mobile app development company uses parallel workflows, agile sprints, and reusable frameworks— dramatically lowering timelines.
Quality Expectations
High standards mean more testing cycles and polish, which extend the process but improve user retention.
Regulatory & Integration Complexity
Apps dealing with user health, finance, payments, or privacy require compliance and can add weeks for review or audit.
Third-Party Integrations
Each integration (Bluetooth, REST APIs, push notifications, maps) adds feature time and regression testing.
Why Work with a Mobile App Development Company?
1. Streamlined Processes & Expert Teams
Agile methodologies, UX/UI workflows, DevOps pipelines, and testing strategies shorten timelines.
2. Reusable Code & Libraries
Proven interface components and backend templates accelerate development.
3. Cross-Functional Collaboration
Designers, developers, QA testers, project managers – all work together efficiently under one roof.
5. App Store Experience
Such partners often have established App Store approval histories and know how to navigate Apple’s guidelines.
Hence, working with an app development company often cuts launch time by 20–40%, while delivering a far more polished experience.
Tips to Speed Up Your iOS App Launch
- Launch an MVP – Start with core features and expand later.
- Leverage frameworks – Use SwiftUI, Combine, and CocoaPods to save dev time.
- Use pre-built backend services – Firebase, AWS Amplify, Backendless.
- Outsource or hire – Fill gaps in beta or testing bandwidth.
- Use continuous integration – Automate builds, testing, and deployments.
- Plan for store approval – Include App Store metadata from the start to avoid delays.