How Long Does It Take to Develop an iOS App in 2025

Developing an iOS app in 2025 involves multiple stages, each of which influences the overall timeline. As a beginner-friendly guide, we will walk you through phases like planning, design, development, testing, and deployment. By the end, you’ll understand realistic timelines and why partnering with a mobile app development company or app development company can help accelerate your project.
Let’s Build Something Amazing Together
Your idea deserves more than just code — it deserves attention, insight, and craftsmanship.

1. Planning & Discovery (1–4 weeks)

Define Goals and Target Audience 
First, you begin with clarity. You establish who your app serves and what value it offers. A clear vision helps developers avoid scope creep later. 

Market Research
Then, you investigate competitors and trends. Doing so reveals features users expect today in 2025.

Feature Prioritization
Next, you rank features by importance. You categorize features as “must-have,” “nice-to-have,” or “future”. This paid-off effort ensures your early-release version (MVP) succeeds.

Technical Feasibility
Also, you discuss architecture with your app development company or in-house team. They evaluate platform choices (SwiftUI vs UIKit), backend needs, and third-party integrations.

Overall, planning typically takes 1–4 weeks, depending on your clarity and the complexity of your idea.

2. UX/UI Design (2–6 weeks)

Wireframes
Firstly, you sketch basic screens. Wireframes define layout and user flow while saving time and effort on design.

Design System & High-Fi Mockups
Then, your UX designers create a design system that includes fonts, colors, icons, and components. After that, they draft high-fidelity mockups to show exactly how the app looks.

Prototyping & Feedback
Subsequently, interactive prototypes show clickable or tappable screens. You test user interactions early to spot usability issues.

In total, expect 2–6 weeks, depending on the number of screens and how fast the feedback loop is.

3. iOS App Development (8–20 weeks)

This phase likely takes the longest because it involves actual coding.

3.1 Setting Up the Environment (1–2 weeks)

3.2 Front-End (UI Components + Navigation) (4–10 weeks)

3.3 Back-End Integration (4–8 weeks)

If your app needs login, databases, or API calls: 

3.4 Module-by-Module Implementation

A typical development schedule might look like:

3.5 Internal Alpha Build & Iteration

After initial coding, your developer builds an alpha version. You test it internally, record bugs, and update features promptly.

Thus, pure development stretches from 8 to 20 weeks, varying by complexity, number of features, and development team maturity.

4. Testing & Quality Assurance (2–6 weeks, parallel)

Testing begins early and continues throughout development.

Unit & UI Automated Tests
Automated tests validate individual functions (unit tests) and user flows (UI tests with XCTest or XCUITest).

Manual QA
Testers manually execute test cases to capture visual or logical issues. They test on multiple devices, iOS versions, and networks.

Beta Testing (TestFlight)
You release a TestFlight build to internal testers or small external groups. Their feedback catches real-world issues.

You repeat the testing cycle a few times until the app is stable and free of critical bugs. Generally, this takes 2–6 weeks, which runs in parallel with development to save time.

5. App Store Submission & Review (2–4 weeks)

This stage includes multiple steps:

App Preparation
You prepare metadata (title, description, keywords), privacy policy, app icon, screenshots, and localization.

Build Submission
You upload your release build via Xcode or Transporter tool.

App Review Process
Apple reviews your app, which can take anywhere from 2 days to 2 weeks depending on the complexity and whether your app uses specific privacy features (like HealthKit, Core NFC, or background location). If Apple requests clarifications or changes, you’ll need time to respond.

All in all, the store submission process typically takes around 2–4 weeks.

6. Post-Launch & Maintenance (Ongoing)

Your work continues after release. It includes:
Many teams allocate at least 3–6 months post-launch for active ramp-up, updates, and maintenance.
Ready to Bring Your iOS App to Life?
Let’s chat about your vision, timeline, and what success looks like for you. We’ll help you get there.

Total Timeline Overview

Below is a summary breakdown:

Stage Duration
Planning & Discovery 1–4 weeks
UX/UI Design 2–6 weeks
iOS App Development 8–20 weeks
Testing & QA 2–6 weeks
App Store Submission & Review 2–4 weeks
Total (to Launch) 15–40 weeks (≈4–10 months)
Post-Launch Nuances (ongoing) 3–6+ months

In short, a typical iOS app in 2025 takes 4–10 months to reach its first launch. However, this duration can shorten if you limit scope or engage a professional app development company with proven processes.

What Influences Development Time?

Multiple factors shape how long development takes:

Complexity of Features

Number of Supported Devices & OS Versions
Optimizing for various devices (iPhones, iPads, future Apple Vision) and iOS versions adds weeks.

Team Size & Experience
A seasoned the best mobile app development company uses parallel workflows, agile sprints, and reusable frameworks— dramatically lowering timelines.

Quality Expectations
High standards mean more testing cycles and polish, which extend the process but improve user retention.

Regulatory & Integration Complexity
Apps dealing with user health, finance, payments, or privacy require compliance and can add weeks for review or audit.

Third-Party Integrations
Each integration (Bluetooth, REST APIs, push notifications, maps) adds feature time and regression testing.

Why Work with a Mobile App Development Company?

If you’re aiming to ship faster, with greater reliability, here’s how a skilled mobile app development company helps:

1. Streamlined Processes & Expert Teams
Agile methodologies, UX/UI workflows, DevOps pipelines, and testing strategies shorten timelines.

2. Reusable Code & Libraries
Proven interface components and backend templates accelerate development.

3. Cross-Functional Collaboration
Designers, developers, QA testers, project managers – all work together efficiently under one roof.

5. App Store Experience
Such partners often have established App Store approval histories and know how to navigate Apple’s guidelines.

Hence, working with an app development company often cuts launch time by 20–40%, while delivering a far more polished experience.

Tips to Speed Up Your iOS App Launch

If a faster go-live matters, here are strategies to use:

Final Takeaway

By mid‑2025, developing a robust iOS app generally takes 4–10 months from concept to App Store launch, plus ongoing maintenance. The scope, team size, complexity, and quality standards all affect the precise time. Partnering with a mobile app development company can significantly reduce your timeline and increase success likelihood.

Conclusion – Hire Autviz Solutions

Want to launch your iOS app faster and with confidence? Hire Autviz Solutions—a leading expert app development company with a proven track record in iOS, Swift, and UX excellence. From ideation to App Store launch, our team offers end‑to‑end support, quality assurance, and post‑launch maintenance. Reach out today and bring your iOS app development London vision to life in 2025!
Work with a Team That Gets It
We’ve helped startups and enterprises alike build and launch iOS apps that users love.

Frequently Asked Questions (FAQs)

Typically, review time ranges from 2 days to 2 weeks, depending on factors like app complexity, privacy‑sensitive data, and App Store queue volume.
You could launch in as little as 2–3 months with MVP scope. However, low quality often leads to poor user experience, bad ratings, and high maintenance costs—ultimately slowing you down.
Prioritize a simple MVP, use pre‑built backend services, automation, and engage a full‑stack development partner to accelerate design, development, and QA.
Budget aligns with app complexity and team rates. Simple MVPs cost less, while advanced apps with backend and integrations cost more. Still, partnering with an app development company can optimize cost/time trade-offs.
Absolutely. Post‑launch you’ll need bug fixes, OS updates, new features, and analytics. Most teams budget 3–6 months of maintenance after launch.
For best iOS performance and UX, native Swift (SwiftUI/Combine) remains ideal. Cross‑platform tools (React Native, Flutter) help you support Android too, but may lead to compromises unless your features stay standard.